2 esa

JOB 5 WORK ORDERS (Continued)
AEC
W.0,No.

Description

Date
Issued

Site

User

865

Run power lead from Control Bldg. to NRL

4/16/51

B

EG&G

866

Remove partition separating A-lO - A-12,

4/16/51

B

Del

867 *

Requisition for misc. equipment & labor.

4/16/51

E

All Users

868

Install hasp on inside door of control

4/16/51

D

%G 3.1

869

Erect pipe hand rail on ladder in con-

4/16/51

B

NRLH

870

Furnish 150 Pipe Stakes.

4/16/51 E

TU 3.1.5

871

Requisition for signs and duck boards.

1/16/51

B

TU 3.1.5

872

Request for pump operator.

4/16/51

B

TU 3.1.5

873

Furnish two fabricated steel plates,

4/16/51

B

NBS

874

Supply one piece plywood, 8' x 4' x 1/2", 4/16/51

B

Proj. 5.1

875

Request for 6 copies of graph to be
reproduced,

4/16/51

B

TU 3.1.1

876

Paint the word LABORATORY on two

4/16/51

B

D-3&

tent.

Bldg. 209.

rack room.
trol area.

thermos jugs.

TG 3.1

877

Mfgr. one work bench for packing tent.

4/16/51

B

NRLK

878

Fabricate gasket with eight bolt holes.

4/16/51

B

UCRL

879 *

Haul 1/2 ov. yd. of sand in front of

4/16/51 E,D

880

Furnish labor to install lead shield

4/16/51

V

881

Furnish cranes & operator; rigger;

4/16/51

V1.7

882

Furnish services of tractor, operator

4/16/51

E

*

Supplements

17-52

misc. Stas,

in Sta. 132,
carpenters,

and dolly.

SBN 2.4
NRLK

NRLK

Select target paragraph3