JOB 5 WORK ORDERS (Continued)
AEC

W.0.No.

Description

Date

Issued _Site

User

789

Replace sash & panes; re~work flashing

L/11/s. $s

Prog.3.3.3

790 *

Sandbag Site "E" Stations.

L/11/51

Prog. 1

791

Move tables, desks & safes; provide a

4/11/51

Prog. 1

792 *

Sandbag Site "V-D" Stations,

4/11/51

793

Dig 1 ditch 60 feet long between Stas.
6A & 6B,

4/11/5l.

V

NRLK

794

Make three Ozalid prints of diagram,

4/11/51.

8B

TU 3.1.1

795

Request for additional survey work.

4/11/51

TU 3.1.1

796

Modify WO.NO, AEC-769; add plywood

4/11/51

&

NBS

797

Relocate two 4' pipes from Engebi to

4/11/51

NBS

798

Miscellaneous electrical work at tower.

4/11/51

UCRL

799

Recover lead bricks from "C"; Distribute

,/11/51 C,E 8.28,

g00

Install fluorescent fixture and wiring.

4/12/51

801

Turn armature down.

4/12/51 ¥V

NRLK

802

Connect 3 phase power to Photographic
Traiier.

4/12/51

NRLK

803

Wire pressure actuator switch on water
system.

4/12/51 B

CMR

804

Cut grooves in two pieces of plywood
and sand,

4/11/51. B

Proj.5.1

805

Remove coax cable from tower on Site E,

4/12/51

E

806

Fabricate two duck boards & two benches,

4/12/51.

B

807

Water stabilization around misc.structures4/11/51 E,S EG&G

*

Supplements

17-48

and siding.

dark room.

strips.

Muzin.

on "EM",

B

Prog. 1

V

LCDR

B

V

EG&G

TU

3.1.1

TU 3.1.5

Select target paragraph3