JOB 5 WORK ORDERS (Continued)
AEC
W.0,No,

- Description

Date
Issued

Site

User

732

Connect line on diffusion pump circuit.

4/7/51

V

UCRL

733

Furnish copper tubing from refrigeration 4/6/51

V

NRLK

734

Construct two plywood boxes,

4/7/5L

2B

NBS

735

Fabricate and install sign.

4/7/51.

«iB

TG 3.1

736

Modify phone service & switchboard con-

4/7/51

C

All Users

737

Dig 2 holes; fill 2 old holes; move Sta.

4/6/51

£

Proj. 5.1

738

Material and equipment to rework tie rods.4/7/51

E

3.3.8h

739

Labor & material for activation of Photo

3/9/51 P,Q

EG & G

740

Furnish rigger to install pipe thru

4/9/51

iE

TU 3.1.4

TAL

Assign maintenance carpenter,

4/9/51

-=B

CMR

742

Perform miscellaneous work in Bldg. 232.

4/9/51

8B

NRLK

743

Dirt or sandbag fill on sides of colli-

4/9/51

E

1.5.2

Thh

Supply labor to help handle radioactive

4/9/51

&E

NBS

745

Check & repair one ditto duplicating

4/9/5.

2B

Das

746

Furnish labor to move 2 mahogany tables.

4/9/51

8B

Prog. 1

TAT

Install additional phone in RAD-SAF,

4/9/51

iB

TU 3.1.5

748

Supply plywood & build filmviewing box

4/ /51

B

EG&G

749

Connect direct phone between Bldgs. 310

4/9/51

B

Prog. 1

stock,

nection.
sign.

Towers.

tower roof.

mator sta.

sources,

machine,

Bldg. 323.
and table.
and 209,

17-45

Select target paragraph3