JOB 5 WORK ORDERS (Continued)
AEC
W,0,No,

Description

Date
Issued

Site

User

548

Repair Yagi antenna assemblies.

3/21/51

B

TU 3.1.1.6

549

Furnish material for use by Med-Bio,

3/20/51

L

SBN 2.4

550

Fabricate &install steel strips on

3/21/51

Proj. 3.1

551

Smooth & stabilize an area in front of

3/21/51

Proj. 3.3

952

Provide steamfitter, electrician, and

3/21/51

CMR

553

Transport and erect two radar reflectors.

3/21/51

Prog. &

554

Furnish labor for one day to move boxes.

3/21/51

NRLK

555

Repair one Monrose Calculating Machine.

3/22/51

EG&G

556

Assign & connect cable pairs in Phone

3/20/51

JTF-3

557

Furnish data for rocket launcher instal-

3/22/51

NOBL

558

Remove & relocate outlet strip in Bldg.
210.

3/22/52

EG&G

559

Furnish 2 wood frames & 2 pes. galv.
screen,

3/22/51

TU 3.1.6

560

Install locking bar & locks on 2 file

3/21/51

Proj. 5.1

561

Procure two hand magnifying glasses,

3/22/51

De2

562

Install 6 outlets in Finishing Rm. of
Bidg. 210.

3/22/51

TU 3.1.6

563

Furnish 44 pieces of plywood.

3/22/51

NALK

564

Ozalid 15 copies of drawings.

3/22/51

565

Perform necessary measurements in tower

3/22/51

566

Provide auxiliary power outlets.

3/22/51

17-36

materials.

Exchange,
lations,

cabinets,

cab.

B
<j PY

3.3.8f.

’

Q

blast doors.

B

TO 3.1.1
Prog. 1

TU 3.1.1

Select target paragraph3