JOB 5 WORK ORDERS (Continued)

AEC
W.0,No,

Date
Issued

Description

Site

User

433

Construct & install book shelf, Bldg.209. 3/14/51

B

TG 3.1

434

Furnish labor & material to construct

3/14/51

D

UCRL

435

Manufacture or furnish 4 hot lockers,

3/14/51

V

NRLK

436

Furnish & perform misc. iron work.

3/14/51.

C,

LASL

437

Support to conduct Project 8.2 dynamite

3/15/51 P,Q

Proj.8.2a

438

Install submarine cable between Site A

3/8/51

A

JTF3

439

Fabricate 10 aluminum, non-magnetic

3/15/51

B

Prog. 7

440

Movement of steel boxes from Sta. 95a

3/15/51

C,

Proj. 8.2

441

Furnish material, cut 50 blocks, and

3/15/51

B

TU. 3.1.5

442

Furnish lumber, plywood & hardware for

3/14/51

B

TU. 3.1.5

443

Repair Calculators.

3/15/5l

B

3.1.1

444

Install electrical wiring at Sta. 132b.

3/12/51 V

445 *

Assist in Structures Program damage

3/15/51

E

446

Construct platform for radar antenna;

3/15/51

B

447

Provide electrician to wire vacuum pumps, 3/15/51

E

NRLK

448

Furnish heavy-duty, 4-ton dump truck.

2/15/51

B

T.0.3.1.4

449

Provide salt water line to sinks in

3/15/51 L

#

Supplements

17-30

hot locker,

tests,

and Buoy.

tent pegs.

thru 95h.

plywood,
cabinet,

survey.

and mount.

labs 6 and 7,

_

D,E

P,S

WNRLK
Prog. 3

NOBL,

AFSWP

SEN 2,0

Select target paragraph3