JOB 5 WORK ORDERS (Continued)
AEC

.

W.0,No,

Description

Date

Issued

Site

User

394

Perform necessary wiring for safelights.

3/12/51

B

TU. 3.1.5

395

Construct supports & deliver to Bldg.2ll. 3/13/51

B

JTF-3

396

Straighten frame for Corona Shroud.

3/13/51

B

UCRL

397

Furnish & connect fire hose with nozzle,

3/13/51

C

T.G.

398

Connect wire grip to wire rope.

3/13/51

B 1T,.G.3.1.5.1

399

Supply dynamite & technician for

3/13/51

C

NOBEL

400

Dig narrow ditch from 301J to camera

3/12/51

E

Prog. 3.4

401

Erect & position reflectors on tele-

3/13/51

C,

EG&G

402

Change power system in 212A.

3/13/51

B

Group J-3

403

Install air conditioning unit in

2/27/51

B

1.5.1

404

Furnish crane & operator to lift vaults.

3/13/51 C,E Proj. 4.2

405

Supply paper drinking cups to 3.1 Whse.

3/13/51

B

406

Manufacture one stainless steel tray.

3/13/51

B

NRLH

407

Install &maintain communications set

3/14/51

B

CTG 3.1,

408

Provide labor to place equipment.

3/14/51

E

409

Furnish locksmith to open file safe

3/14/5L B

TU 3.1.6

410

Repair typewriter & return to Bldg. 211.

3/14/51

B

NOEL

411 *

Install wiring & communication equipment 3/14/51

B

Prog. 1

412

Misc, location surveys of sci. stations,

C,

amTCU

Sta, 18.

instruction,
stations.

phone poles,

Building 212A.

and antenna.

in Bldg. 210,

Supplements

17-28

3/14/51

D,E

V,E
;

3.1.5.1

All Users

D-3

NOBEL

3.4.3

Select target paragraph3