JOB 5 WORK ORDERS (Continued)
AEC

WO, No,

Description

Date

Issued Site

User

215

Build an A frame; build one "hot" cabinst.2/22/51

V

NRLK

216

Erect telephone relay racks in Stas, 132 2/22/51

E

NRLK

217

Establish wiring freeway in 4-inch pipe. 2/23/51

E

LASL

218

Move 4 boxes from tower area to Sta.132. 2/23/51

E

NRLK

219

Requisition for the services of a crane, 2/23/51 E,S,

Proj. 8.2

220

Repair costumer - Reattach leg of tree.

2/23/51

B

JTF-3

221

Construct and paint one rack.

2/23/51

B

D3

222

Furnish labor to open, empty, reassemble

2/23/51

E

UCRL

223

Erect one 14' x 14! tent with hot

2/23/51 B

NRLE

224

Rewire lighting in office & lab; change

2/23/51

225

Furnish labor to stretch 100,000 feet
of cable,

2/23/51 E,D

226

Supply one generator for auxiliary
power,

2/23/51

227

Construct four incinerators.

2/24/51 B

All Users

228

Furnish carpenter to build target

2/24/51

E

NRLK

229

Furnish one welder for four days work.

2/24/51

E

AMC

230

Remove two secondary poles as an

2/23/51

B

231

Install buckets inside of doors in

2/24/51 C,E NBS

232

Manufacture 300 flanges for 7/8 cable,

2/23/51

233

Run pipe from tank to tent; attach

2/24/51

and 141,

Q,P

boxes.

locker,

outlet.

at Sta, 132d.

obstruction,

Stas. 54 & 57.

pump.

B

V

NRLH
NRLK

NRLK

NRLH

NRLK
V

NRLK
17-19

Select target paragraph3