JOB 5 WORK ORDERS (Continued)
AEC
W.0, No,

Description

Date
Issued Site

User

24

Perform necessary alterations to three

1/17/51 ALL

All Users

25

Repair typewriter,

1/18/51

B

JTF-3

26

Requisition of plywood.

1/22/51

B

AMC

27

Requisition for piece of pipe.

1/22/51

B

Proj. 4.2

28

Perform alterations in Fire Station Bldg.1/22/51

B

D-2

29

Fabricate film tank, frame, and reels.

1/24/51

B

D-2

30

Activate one each 24V Exide Aircraft

1/25/51

B

Proj. 4.2

LOM ts,

Battery.
.s

31

32

Metal work on Stations 121 A-E,

1/25/51 E,V J-10

33

Material Requisition

1/25/51

B

Proj. 4.2

34

Regrind points for Whittemore gauge.

/1/25/51

E

Sandia

35

Electrical work - Building 335a.

1/25/51

E

3.4

36

Make 12 signs,"DANGER HIGH VOLTAGE".

1/25/51 ALL NBS

37

Place markers in tower and at ground

1/25/51 E,V, All Users

38

Machine one stainless steel connector,

1/29/51

39

Relocate exhaust ventilation in Sta-

1/25/51 £,C

40

Move eight limonite concrete blocks

1/25/51 E,C LASL

4l

Provide material and construct four

1/27/51

Determine extent Stations 52 & 53 are

1/30/51 C,E NBS

zero,

tions 54.

from E to C,
"A" frames,

C

B

B

4.2
NBS

Des

42

43

settling.

17-9

Select target paragraph3