Feature

Estimated

Total Cost

Total

Incurred Cost

Direct

Indirect

ISLAND
BUILDINGS AND
FACILITIES

Blading & shaping

38,165

71,464.90

70

18.67

Other areas

167 ,050

118,870, 35

Dust Palliative

11,010

98.90

216,295

190,452.82

129,011.07

61,441.75

93,555

141 , 521.40

90,144.07

51 , 377.33

181 ,235

98,271.73

53,291.02

44,980.71

56,950

28 ,997 .62

16,016.88

12,980.74

197 ,900

240,083.00

144,761.55

95,321.45

Water Facilities

178,850

178,928.70

128,616.57

50,312.13

Sewer Facilities

72,980

16,140.54

10,067.14

6,073.40

Elec, Facilities

197 ,685

169 ,698 . 32

132,093.05

37,605.27

7,780

10,340.87

8,270.31

2,070.56

53,505

38,276.92

21,966.00

16,310.92

10,950

1,661.31

797.38

863.93

1,855

48.89

48.89

5,050

66,767 .46

60,758.60

6,008.86

2,300.72

2,425,00

Asphalt surfacing -

Roads

Asphalt surfacing -

Total
Aluminum Bldgs,

Concrete Building
Tents, including
slab
300-foot Tower,

complete

Telephone Facili-

ties

Control & Signal

Equipment

Radio Back-up Equip~
ment (Equipment
furnished by

Military)

Public Address

System

Equipment (not

installed)

Furniture

4,880

4,725.72

-

12-19

Select target paragraph3