CHAPTER 12.5
COST ESTIMATE COMPARISONS
Two studies have been prepared in connection with cost estimates
on this project which point up certain relevant facts. In the first of

these studies, estimated costs for each of the various features of work

performed at the Eniwetok Froving Ground were compared with the actual
costs incurred as collected in the various cost centers established by
fiscal procedures. The second study constituted an analysis of the
actual costs of major features of construction and a comparison of
these costs to estimates of costs of comparable construction at a West
Coast location in order to establish an empirical multiplying factor
for construction at Eniwetok, The results of these studies are set
forth at length hereinbelow.

COMPARISON OF ESTIMATED COSTS
WITH ACTUAL COSTS AS OF JUNE 30, 1951
Estimated
Total Cost

Feature

Total

Ineurred Cost
Direct

Indirect

PARRY ISLAND BUILDINGS AND
FACILITIES

Blading & shaping

176,850

Asphalt surfacing

-

Dust palliative
rer

Aluminum bldgs.
Frame storage

252,010.19
300.17

10,870

6 361,73

187,720

258,672.09

153,974.07

104,698.02

1,999,100 2,309,898.67 1,533,615.73

776,282.94

1,715

1,727.88

1,158.78

569.10

106 ,030

94,946. 35

55,252.60

39,693.75

86,825

127,746.55

112,397.48

15,349.07

Water facilities

652,475

530,438.42

376,236.06

154,202, 36

Sewer facilities

130,465

108,434.44

66,511.36

41,923.08

vault

Tents, including
slab

Refrigeration Plant

12-14

Select target paragraph3