as soon as Program 2 personnel depart from the Jobsite,

On

Parry Island it will cease as soon as Scientific and Task
Force personnel depart from the Jobsite, crating and shipment of scientific and other equipment to Z.I. is completed,
and transfer of your roll-up and maintenance personnel to
quarters on Eniwetok is accomplished,

(c) On Eniwetok Island your limited Job No, 4 duties as
described in paragraph 2(a) above will cease when Task

Force personnel have departed (October 1, 1950) amd will

be replaced by full Job No. 4 duties as described in the
Contract with the exceptions listed below, which exceptions

are predicated on CINCPAC approval of a proposed memorandum
of agreement for military support during the roll-up
period.

(1) Provide messing facilities only for your own personnel,
The garrison will provide its own mess,

(2) Provide quarters and administration space for the
garrison but not housekeeping or supplies for such
quarters and space, except beds and mattresses.

(3) Provide one-half of the stevedoring crew required,

also lighters and operators, fork lifts and operators,
and cranes and operators, from hold to warehouses.

The garrison may be assumed to total not more than
125 men, and will furnish one-half of the stevedoring

crew, also trucks and operators, from hold to
warehouse,

(4) Provide operation and maintenance only for your ow
boats, vehicles and equipment.

(5) Except as noted above, the garrison will supply all

personnel required for its own support, but you will
operate all utilities and maintain all facilities

- including buildings, roads, and utilities,
Job

_N

;_S

-Up

S$

3

(a) Provide a labor pool to assist the Scientific personnel in
installation and removal of instrumentation and equipment,

and other work incidental to the actual tests.

More de-

tailed information concerning these requirements may be
found in the following letters,

(1) H.& N Inter-Office Memo fram Bowen to East, dated
July 13, 1950.

(2) SD-5837 dated July 13, 1950, subject: "Estimated Labor
Pool Requirements for Greenhouse-Hall and GreenhouseKrause",

12-11

Select target paragraph3