Form No. 0/3 10U
Dwg. No.

HOLMES & NARVER

Order No.

Type F.S. No.
Date:
Title:
Location

INCORPORATED

CHANGE ORDER

~Kind

Job No.
Sheet No.

Detailed

of Change

Reason for

Contract No.

Project No.

Description of Change

of

“Authority

for Change

TENTATIVE COST ESTIMATE AT JOBSITE...

change:

Affects Dwg. Nos.

Proposed By:

Date:

Recommended By:

Date:

Approved By:

Resident Manager, H & N

Date:

Approved By:

Resident Engineer, AEC

Date:

REIMBURSEMENT AUTHORITY
Approval of the above change in work or services, by the undersigned, constitutes reimbursement authority, covering the cost incurred in the performance of the work, as revised.
Any change in the scope or character of the work necessitating adjustment

of the total estimated contractual cost, and/or an adjustment of the Con-

tractor's fixed-fee, will be authorized subsequently, by formal modification to the contract, in accordance with the provisions of Article XIII,
Contract AT-(29-1) -507.
Approved By:

Contract Administrator

Date:

Approved By:

Contracting Officer

Date:

Remarks:

DISTRIBUTION

A. BE. C.

Los Angeles

.

2
3

Engineering Div. Orig & 1
Fiscal
3

Construction Mgr.

Service Operations

Const. Off.
Insp. Off.

6

1
1
1

-

Cost Code

L1-45