JOB 5 WORK ORDERS (Continued)
AEC
W,0,No.
Description
Date
Issued Site
User
4/26/51 Atoll D-3
Remove tunnel; clear entrance to Sta. 54. 4/26/51
NBS
963
Purchase misc. items in Honolulu.
4/26/51
NRLH
964
Make five aluminum trays.
4/27/51
965
Furnish 12 pieces of wood, 2% x 2% x 4'.
4/27/51
966
Furnish welder and equipment and crane,
4/27/51
967
Make seven 10' x 10! rafts,
1/27/51 D-V
J-3
968
Supply 12 pieces of plywood, 1/4" x
L/27/51
NBS
969
Relocate tent frame; perform electric
L/27/51
UCRL
970
Provide DUKW equipped for J-3 recovery
oper.
Lf27/51
J-3
971
Excavate path thru causeway; build sand
ramps,
;
4/27/51
J-3
972
Install control cable between tower and
4/27/51
UCRL
973
Fabricate 250 cage lids in sheet metal
1/27/51
SBN 2.4
974
Erect 16! x 321 tent at Station 144.
L/27/51
NRLK
975
Requisition for labor.
4/27/51
J-3
976
Furnish labor to assist in packing
excess gear.
1/27/51
NRLK
977
Prepare truck for overseas shipping.
5/28/51
Prog. 6.3
978
Perform misc, work on and around tower.
4/28/51
979
Drill 2 holes per brick in 32 lead bricks, 4/28/51
.
11/2" x 32",
work.
Sta, 135.
shop,
w
962
EG&G
wo
Prepare schematic diagram of atoll cable
system.
6.3
a
961
APG
NRLH
17-57