JOB 5 WORK ORDERS (Continued)
AEC
W,0.No,
Date
User
Site
750
Fabricate & install vent pipes in 22
4/9/51
751
Wash down Bldg. 212A with fire hose,
4/9/51
5-3
752
Move three fission cameras,
4/9/51
J-3
753
Construct windbreak & flies over colli-
4/9/51
J-3
75h
Move three new fission cameras.
4/9/51
J=-3
755
Move boiler plates on collimators from
4/9/51
J-3
756
Modify winch blast shield and bracing.
4/9/51
J=3
757
Modification and relocation of winch,
4/9/51
J-3
758
Dig holes for installation of storage
batteries,
4/7/51
SBN 2.3
759
Reproduce forty-five copies of chart.
4/9/51
JTF-3
760
Erect eight tents (ridge poles only;
no frames).
4/9/51
NRLH
761
Construct eight bins with shelves.
L/ /51
762
Repair typewriter,
4/9/51
ww
Issued
D-4
D-4
763
Disassemble aluminum structures.
4/9/51
TO
Description
764
Install.& wire vent for film lacquering
4/9/51
765
Concrete work & duckboards at Rad-Safe
4/9/51
RAD-SAF
3.1.5
766
Erect tent; clear airstrip of debris.
4/9/52
D-3
767
Furnish plywood sheets, disks and wiré.
4/10/52
NBS
768
Install a phone in the telemetering shack 4/10/51
Prog. 1.9
769
Fabricate and place pipe stakes.
NBS
17-46
mators,
C to E,
machine,
Bldg.
4/10/51
C
wo
vaults,
4.2
EG&G