JOB 5 WORK ORDERS (Continued)
AEC
W.O.No,
Description
Date
Issued
Site
User
690
Recharge one battery.
4/3/5L
B
Proj. 4.2
691
Hang door in Room A-13, Bldg. 209.
4/2/5L
B
De2
692
Move dural and steel racks at Sta, 624.
4/3/51
S
Proj. 6.2
693
Replace J-5 Office Tent with new tent.
4/3/51
3B
JTF3
694.
Pitch a l4' x14! tent with side frames.
4/3/51
B
Prog. 7
695
Furnish operator for Rad-Safe shower
4/3/51.
3B
RAD-SAF
pulp.
696
Maintenance for radio equipment.
4/3/51.
<A
Prog. 6.1
697
Construct pigeonhole sorting bin.
4/3/51
BB
Ded, TG 3.1
698
Install & maintain radio equipment.
4/3/51 B,E
699
Erect a barricade in coax cable trench.
4/3/51
E
700
Rout 40 masonite sheets,
4/3/51
UL
SBN 2.4
701
Move five lead shields.
4/3/51 C,E
SEN 2.4
702
Install two plywood bulletin boards,
4/4/51
B
TG 3,1
703 *
Furnish cherry picker operator.
L/4/5.
CC
J-3
704
Install light outside door of Bldg. 212A. 4/4/51
B
J-3
705
Install shielding in 200' tower.
4/4/51.
VV
NRLK
706
Fabricate two 9" x 3" copper cylinders,
4/4/51
B
UCRL
707
Mfgr. one stainless steel developing
4/4/5.
3B
NRLH
708
Furnish 12 pieces soft pine lumber.
L/4/5.
B
Prog. 1.7
709
Install slide bolt, staple, and hasp.
4/4/51
B
TG 3,1
710
Construct a brass overflow pipe.
4/4/51
B
TU 3.1.5
711
Manufacture three crank handles.
4/5/51
B
NBS
#
Supplement.
tray.
Prog. 3
UCRL
17-43