JOB 5 WORK ORDERS (Continued)
AEC
W.0,No.
Description
Date
issued
Site
B
User
650
Install selector switch and bracket on
3/30/51
651
Furnish benches from theater at C to
3/27/51
Prog. 3
652
Connect gasoline drums to generators.
3/30/51
653
Install two lights in Gun Locker,
3/30/51
654
Recharge one battery,
3/30/51
655
Deliver two portable generators.
3/30/51
656
Move Station 174 to closest dry land.
3/30/51
657
Furnish material for permanent shelves,
3/30/51
658
Furnish carpenter to build shelves in
3/30/51
659
Machine two vacuum tank cover plates,
3/30/51
660
Furnish two carpenters to make relay
3/31/51
661
Chip concrete grouting.
3/29/51
662
Print signs on light weight cardboard.
3/31/51
663
Repair two Friden calculators.
3/31/51
664
Fabricate three steel plates.
3/31/51
665
Furnishand manufacture six tarps.
3/31/51
666
Install & wire fan; install door latches. 3/30/51
667
Construct two wooden camera carrying
3/31/51
EG & G
668
Furnish two plywood signs.
3/30/51
NRLK
669
Install EE-8 phone in Building 209.
3/31/51
D-3
670
Fabricate & weld steel plates & helmets,
3/31/51
racks,
WR
wo
wb
4.2
>}
ACC
sgqnmnene0oUo
EG & G
TU 3.1.5
ow
NRLK
UCRL
Gi
boxes,
JTIF-3
EG&G
ww
Sta, 14ib.
BG & G
NBS
nwnwo
USNS Mowrer.
NRDL
<i
phone.
Prog. 1
NRLK
D-3
TU 3.1.1
D=3
17-41