JOB 5 WORK ORDERS (Continued)
AEC
W,0.,No,
Description
Date
Issued
Site
User
609
Labor and material for coax project.
3/26/51
E
NRLK
610
Provide two direct lines with BE-8 Phones, 3/27/51
B
Prog. 1
611
Fabricate 2 pieces of plywood; provide
6 stakes,
3/27/51
8.2B
612
Chart made by Engineering section,
3/28/51
D—5
613
Furnish extension off MP phone to wooden
3/27/51
NRLH
614
Ozalid 12 copies of graph.
3/28/51
D-5
615
Construct
3/27/51
TU 3.1.5
616
Construct box for film dryer.
3/28/51
NOEL
617
Extend two rods.
3/27/51
JTF-3
618
Insert lead disks.
3/28/51
NBS
619
Drive eight 2 1/2" pipes.
3/28/51
NBS
Make test placement of inner doors.
3/28/51
NBS
621
Drill four holes in limonite.
3/28/51
NRLK
622
Furnish telephone pair for telemetering.
3/28/51
Prog. 1
623
Machine work on gasket face,
3/28/51
UCHL
624
Construct temporary plywood doors.
3/28/51
UCRL
625
Machineexpansion engine valve stem,
3/28/51
626
Two photo. auto. adjustable enlarging
3/29/51
TU 3.1.6
627
Provide 1 3-dimensional Radex Plotting
3/24/51
JTF-3
628
Furnish plywood, stove bolts & misc.tools, 3/28/51
JTF-3
629
Furnish stripping on panels in Conference 3/28/51
JTF~3
. 620
tower,
five wooden dosimeter racks.
easels,
Device,
Room,
17-39