JOB 5 WORK ORDERS (Continued)
AEC
W,0,No.
Description
Date
Issued
Site
User
567
Install two blackboards,
3/22/51
B
568
Mfgr. plywood container for transmisso-
3/22/51
B
569
Construct wood stand & secure to top of
3/23/51
E
570
Weld two 55 gallon drums together.
3/23/51
E
Proj.6.10
571
Dig hole near concrete shelter 3.1.3,
3/23/51
EB
Proj.6.10
572
Construct small watertight box.
3/23/51
B
J-3
573
Panel or plank area on So. end of Bldgs.
3/23/51
B
CMR
574
Furnish lumber.
3/23/51
B
5.1
575
Place reference points.
3/23/51 C8, Prog. 1
576
Four ozalid copies of report.
3/23/51.
B
G&G
577
Fabricate rack.
3/23/51
B
CMR
578
Furpish one piece of brass.
3/24/51.
V
NRLK
579
Install light with reflector.
3/24/51
B
De2
580
Install ten telephones in Bldg. 221.
3/24/51
B
JTF=3
581
Place marstien matting on the north beach. 3/24/51
T
Prog. 2
582
Reface and regroove gasket plate.
3/24/51
V
583
Design timbering and make sand fill.
3/26/51 E,C NBS
584
Furnish labor to build collimating walls. 3/24/51 V
585
Mfgr. & deliver partitions for Bldg. 222. 3/22/51
B
JTF-3
586
Repair eight typewriters,
3/26/51
B
Ded
587
Drill & open safe file; make repairs.
3/26/51
B
D2
588
Repair Friden Calculator.
3/26/51 B
meter,
vault.
329 & 330.
TU 3.1.1
NRLH
Prog. 7
UCRL
NRLK
NOBL
17-37