JOB 5 WORK ORDERS (Continued)
AEC
W.0, No,
Description
Date
Issued
Site
User
234
Furnish three pieces of plywood.
2/24/51
B D3
235
Remove partition between Rms, A-5 &
A-9, Bldg. 209.
2/24/51
B D3
236
Supply varnish and paint.
2/24/51
L MBD-BIO
237
Furnish 4 laborers and 2 carpenters
for misc, work.
2/24/51 E,V NRLK
238
Make nine box handling hooks.
2/24/51
239
Fabrication of one set "Box Hooks",
2/ /5l1 B
DA
240
Furnish 1 cherry-picker crane operator
2/26/51
Prog. 2
241
Install and maintain misc. radios
2/26/51 B,C RAD-SAF
242
Furnish one electric arc-welding rig.
2/26/51 S,Q, Proj. 8.2
243
Dig five holes and pour concrete.
2/26/51 E,S, Proj. 8.2
244
Furnish & set up one 14' x 14! tent
2/26/51 C,E, NRLH
245
Mfgr. & paint tables; mfgr. & install
2/24/51 B
JTF=3
246
One truck & two laborers to pick up
empty boxes.
2/26/51
B
Ded,
TG 3.1
247
Construct four "A" frames for vehicles,
2/26/51
B
Ded
248
Sheet metal repair-photocell containers. 2/27/51
B
NRLH
249
Furnish necessary labor & equipment.
2/27/51
B
LASL
250
Survey measurement.
2/27/51
B
251
Provide tent flies; furnish labor
2/27/51 E,V 3.1.1.8
17-20
for 1 day.
and antenna,
with frame.
signs,
for misc. work.
B
L
3.1.1.8
P
Prog. 8
Gen