CHAPTER Il, SECTION 3
imbedded 2% feet in the concrete with 4%
feet projecting.

PARTICIPATION: 1 and 15

Station 3402.02 was a 4-inch pipe, 4%4
feet long projecting above the roof of Station
1520.

CONSTRUCTION: 7-20-58 /7-26-58

STATIONS:

SITE:

3440.01 - .07

Utirik, Wotho, Kwajalein,

Rongelap, Fred, Nan,
Ujelang

USER:

SC

PURPOSE:

Microbarograph Station

PARTICIPATION: All Events,
Except 1 and 15
DESIGN PSI:

None

CONSTRUCTION: Sta. 3440.01,
3-8-58 /3-24-58;
Sta, .02, 3-7-58 3-20-58
Sta. .03, 2-18-58 / 3-18-58;
Sta. .04, 3-7-58 3-26-58;
Sta. .05, 3-8-58 /4-23-58;
Sta. .06, 4-7-58 -4-12-58;
Sta. .07, 3-22-58, 3-25-58
No Home Office engineering or Jobsite
construction. See Chapter II, Section 1, Surveying, for work done on these stations.

STATION:

3480.01

SITE:

Off Yvonne

USER:

sc

PURPOSE:

Control Shack

PARTICIPATION: 1 and 15
DESIGN PSI:

None

CONSTRUCTION: 7-20-58/8-2-58
A 10x10x7-foot wood shack was constructed
on the west end of a Navy-type YCV Barge
anchored off Site Yvonne. One 3x7-foot door,
two plywood shutters, and one work bench were
provided in the structure.
Power was supplied to lights and receptacles

in the shack from a 10-kw, 120/208-v, 3-phase
generator mounted on the barge deck. Two
floodlights were located on the corner of the
facility to provide deck illumination. Power was

furnished to Stations 3488.01 and .02 from this
station.

STATION:

3481

SITE:

Yvonne

USER:

SC

PURPOSE:

Snatch Block

Page 124

DESIGN PST:

None

This station was a concrete deadman, 3x3x3
feet, with two 34-inch lifting lugs and one
34-inch hairpin anchor.

STATIONS:

3483.01 through .42

SITE:

Yvonne

USER:

SC

PURPOSE:

Monitoring Stations

PARTICIPATION: 1 and 15
DESIGN PSI:

None

CONSTRUCTION: 7-21-58/7-24-58
Each station was a 2x2-inch wood stake
54 inches long with 24 inches embedded below
grade.
STATIONS:

3484.01 through .08

SITE:

Yvonne

USER:

SC

PURPOSE:

Sticky Pan

PARTICIPATION: 1 and 15
DESIGN PSI:

None

CONSTRUCTION: 7-21-58/7-25-58
A 2-foot-square, 4-inch-thick plywood
panel supported at an an Elevation of+ 8 by a 2-

inch-diameter, Schedule 40 pipe, was erected for
each station. The 2-inch pipe was grouted in a
6%4-inch- diameter by 18-inch-deep hole in the

reef.

STATIONS:

3485.01 through .14

SITE:

Yvonne

USER:

SC

PURPOSE:

Continuous Monitoring
Stations

PARTICIPATION: 1 and 15
DESIGN PSI:

None

CONSTRUCTION: 7-20-58 /7-31-58
Stations 3485.01 through .08 were eight.

2x2-inch wood stakes 5 feet long with 2 fee

driven below grade. Stations 3485.09 throug]

.14 were six 2x2-inch wood stakes 3 inches long

fastened to the deck of a YCV barge moored off
Site Yvonne by an angle iron bracket.