CHAPTER 11, SECTION 3
on three sides and aluminum siding on the fourth
side. The roof of the structure was designed as
a working level with handrails around the peri-
PARTICIPATION: 1514.01 -.02, All
Eniwetok Events Except
1, 2, 15, 16, and 42;
1514.03 -.04, All
Bikini Events
meter and was provided with an access ladder
from the cab,
STATION:
1512
SITE:
Alice
USER:
LASL/EG&G
PURPOSE:
Photo Station
PARTICIPATION: 21
DESIGN PSI:
None
DESIGN PSI:
None
CONSTRUCTION: 12-2-57/4-20-58
The cabs on the 75-foot towers, Stations
92.01 through .04 respectively, were used for
these stations. The cabs were 14 feet square and
contained roll-up doors on three sides. Rehabii-
tation of the stations to their REDWINGcondition was accomplished.
CONSTRUCTION: 2-13-58/4-4-58
STATION:
1515
This station was obtained by rehabilitating
existing REDWING Station 1541. This facility
SITE:
Oboe
structure. The only requirements were to re-in-
USER:
LASL
PURPOSE:
Pad for Photo Trailer
was a two-story,
heavily reinforced concrete
stall mechanical and electrical equipment, to renew deteriorated exterior wood construction,
and to sandblast and paint steel surfaces where
necessary.
STATIONS:
1513.01 - .02
SITE:
Yvonne, Janet
USER:
LASL; EG&G
PURPOSE:
Photo Tube
PARTICIPATION: 1513.01 - 17, 20, 22, 23, 24,
29, 32, 33, 34;
1513.02 - 10, 21, 25, 27,
28, 30, 37
DESIGN PSI:
None
CONSTRUCTION: Sta. 1513.01,
9-26-58/4-11-58;
Sta. 1513.02,
12-24-57/5-24-58
Station 1513.01 was on the roof of existing
Station 77.01, Site Yvonne, and Station 1513.02
PARTICIPATION: 11, 12, and 13
DESIGN PSI:
Not Applicable
CONSTRUCTION: 3-3-58/3-8-58
The location of this station was the top of
the earth-fill over Station 2132. A User-furnished
trailer was located on the stabilized fill, and an
access road was provided, Power was supplied
from the 10-kw generator serving Stations 2130
and 2132.
STATION:
1520
SITE:
Yvonne
USER:
LASL/SC
PURPOSE:
Recording and Photo
Station
PARTICIPATION: 1, 15, 20, 28, 33
DESIGN PST:
16 psi
CONSTRUCTION: 12-2-57/4-20-58
was located on the roof of new Station 77.02,
Site Janet. Each station consisted of two con-
This station was provided by rehabilitating
and modifying existing REDWING Statior
1520. Rehabilitation included re-installing elec.
tric motors, sandblasting, painting, and recondi-
feet.
included an air compressor and air supply lin
from the Equipment Room to the Camera Roon.,
crete blocks, 14 feet long, poured with roof slab
of the timing station below. One block was 4x4
feet in cross section, and the other was 3x44
There were three 42-inch-square steel
plates mounted on each block and conduit runs
down through the blocks and roof slab. The
blocks were utilized to set photographic equipment.
STATIONS:
1514.01 through 1514.04
SITE:
Wilma, Mack, How,
William
USER:
PURPOSE:
Page 104
tioning of the existing facility. New constructic
a User-furnished motor generator set for scientific equipment power, a new 4160-v, 208/120-"
3-phase, 60-cycle, 150-kva indoor transfarme
an electrical switch, and a circuit breaker.
STATION:
1522
SITE:
Yvonne
LASL ‘EG&G
USER:
LASL
Photo Cabs on Tower
PURPOSE:
Mirror House