CHAPTER 11, SECTION 3 on three sides and aluminum siding on the fourth side. The roof of the structure was designed as a working level with handrails around the peri- PARTICIPATION: 1514.01 -.02, All Eniwetok Events Except 1, 2, 15, 16, and 42; 1514.03 -.04, All Bikini Events meter and was provided with an access ladder from the cab, STATION: 1512 SITE: Alice USER: LASL/EG&G PURPOSE: Photo Station PARTICIPATION: 21 DESIGN PSI: None DESIGN PSI: None CONSTRUCTION: 12-2-57/4-20-58 The cabs on the 75-foot towers, Stations 92.01 through .04 respectively, were used for these stations. The cabs were 14 feet square and contained roll-up doors on three sides. Rehabii- tation of the stations to their REDWINGcondition was accomplished. CONSTRUCTION: 2-13-58/4-4-58 STATION: 1515 This station was obtained by rehabilitating existing REDWING Station 1541. This facility SITE: Oboe structure. The only requirements were to re-in- USER: LASL PURPOSE: Pad for Photo Trailer was a two-story, heavily reinforced concrete stall mechanical and electrical equipment, to renew deteriorated exterior wood construction, and to sandblast and paint steel surfaces where necessary. STATIONS: 1513.01 - .02 SITE: Yvonne, Janet USER: LASL; EG&G PURPOSE: Photo Tube PARTICIPATION: 1513.01 - 17, 20, 22, 23, 24, 29, 32, 33, 34; 1513.02 - 10, 21, 25, 27, 28, 30, 37 DESIGN PSI: None CONSTRUCTION: Sta. 1513.01, 9-26-58/4-11-58; Sta. 1513.02, 12-24-57/5-24-58 Station 1513.01 was on the roof of existing Station 77.01, Site Yvonne, and Station 1513.02 PARTICIPATION: 11, 12, and 13 DESIGN PSI: Not Applicable CONSTRUCTION: 3-3-58/3-8-58 The location of this station was the top of the earth-fill over Station 2132. A User-furnished trailer was located on the stabilized fill, and an access road was provided, Power was supplied from the 10-kw generator serving Stations 2130 and 2132. STATION: 1520 SITE: Yvonne USER: LASL/SC PURPOSE: Recording and Photo Station PARTICIPATION: 1, 15, 20, 28, 33 DESIGN PST: 16 psi CONSTRUCTION: 12-2-57/4-20-58 was located on the roof of new Station 77.02, Site Janet. Each station consisted of two con- This station was provided by rehabilitating and modifying existing REDWING Statior 1520. Rehabilitation included re-installing elec. tric motors, sandblasting, painting, and recondi- feet. included an air compressor and air supply lin from the Equipment Room to the Camera Roon., crete blocks, 14 feet long, poured with roof slab of the timing station below. One block was 4x4 feet in cross section, and the other was 3x44 There were three 42-inch-square steel plates mounted on each block and conduit runs down through the blocks and roof slab. The blocks were utilized to set photographic equipment. STATIONS: 1514.01 through 1514.04 SITE: Wilma, Mack, How, William USER: PURPOSE: Page 104 tioning of the existing facility. New constructic a User-furnished motor generator set for scientific equipment power, a new 4160-v, 208/120-" 3-phase, 60-cycle, 150-kva indoor transfarme an electrical switch, and a circuit breaker. STATION: 1522 SITE: Yvonne LASL ‘EG&G USER: LASL Photo Cabs on Tower PURPOSE: Mirror House

Select target paragraph3