ems
tae!
Seale

PART I, CHAPTERS 1 and 2
*Rongelap

H&N

an

performed new construction on

Truk, Rongelap, Ponape, and Nauru, 660, 280,

*Wotho
*Ujelang

*At these locations Rad-Safe information

was provided by U.S. Public Health Service

personnel, independent of the JTF Seven
Weather Servicestaff. All stations provided RadSafe service as a protection to the inhabitants.

370, and 770 nautical miles respectively from
Eniwetok Atoll. Rehabilitation and/or new construction were also provided at the otheroff-atoll
sites. The camps at Wotho, Ujelang, Utirik, and
Rongelap were operated by H&N, whereas the
gther off-atoll locations were operated by JTFeven,

CHAPTER 2
MISSION — TASK GROUP 7.5
2.1

The principal tasks assigned by CJTFSeven to TG 7.5 were detailed in the
following JTF-Seven publications:
Administrative Plan 1-58

b.

Operation Plan 1-58

c.

Operation Order 35-58

d.
2.2

c.

Operate pass and badge system for
EPG.

i.

Operate guard system for the protection of restricted areas.

j.

Handle reception, custody, security,
and movement of test devices,
weapons, and classified materials
within the EPG.

k.

Operate and maintain TG 7.5 boatpools at Sites Elmer and Nan, and at

(Interim Phase Operation Order)

Based on the above documents, CTG 7.5

b.

h.

Operation Order 45-58

published the following:
a.

2.3.

(HARDTACK-Johnston Island
Phase)
,

Support TG 7.1 Rad-Safe organization by providing personnel, equipment, and facilities.

Johnston Island.

CTG 7.5 Operation Order 1-58
Standard Operating Procedure Task

1.

Special instructions for each event

m.

Group 7.5

Provide the necessary structures to
meet diagnostic and military effects
test requirements.

b.

Construct and operate camp or base
facilities at Johnston Island, Bikini
Atoll, and all islands of Eniwetok
Atoll, except Sites Fred and David.

c.

Operate all utilities at Bikini Atoll,
Eniwetok Atoll, and Johnston Island,
except the POL farm on Site Fred.

d.

Construct camp and operating facilities at off-atoll Weather and RadSafe Stations.

e.

Operate and maintain communications centers to serve TG 7.1 and
TG 7.5.

f.

Operate and maintain telephone
systems required at Eniwetok and
Bikini Atolls, except Site Fred.

and

trucking

Participate in Task Force pre-shot

and emergency post-shot evacuation

plans.

The following is a brief summary of the
responsibilities of TG 7.5:
a.

Provide stevedoring
operations.

-

a.

g.

n.

a

Provide Air Priorities Agents and

cargo handling personnel to expedite

and control the shipment of personnel
and cargo hetween Eniwetok and
Bikini Atolls and between Eniwetok
Atoll and the Weather and RadSafe Stations.
2.4

Three major obstacles were encountered
in accomplishing the mission of TG 7.5.
(1)

The late receipt of criteria from
the Users and the advancement of
the Operation starting date from
1 May to 15 March 1958 compressed
the construction schedule into one
that was
approximatel
three
months less than that of Operation
REDWING. It should be noted
that since the Laboratories did not
have a firm delivery schedule for
all devices to be tested in sufficient
time to provide diagnostic requirements and criteria to H&N, con-

b

Page 18

Select target paragraph3