@

ALCOby5

ama

STANDARD FORM NO. 64

Office Memorandum e UNITED STATES GOVERNMENT
TO
FROM

SUBJECT:
SYMBOL:

Howard Ce Brown, Jre, Executive Officer

26, 1951

DATE: Feb

' Division of Biology and Medicine

Robert Le Butenhoff, Chief, Radiation Instruments Ea)
Branch, Division of Biology and Medicine

RESIME OF RADTATION TNSTRUMENTS BRANCH PARTICIPATION IN GREENHOUSE

PROJECT Sel
BMR:RLB

R

The necessity for testing AEC develoved instruments at Greenhouse made

itself evident during the early part of 1950.

Primarily, it was felt

that field tests on instruments being developed by AEC for possible
civil defense use were required which would include tests on both

dosage~rate and dosimeter instrumentse

Secondly, a field evaluation

of the AEC Emergency Monitoring Team Kits was felt necessary in order
to determine the adequacy of the instruments and equipment in these
kits for emergency monitoringe In connection with this evaluation,

information is required on the importance of measuring alpha and

beta radiations as compared to the current idea that the measurement
of gamma radiation is all that is requirede The spectral dependency
of instruments is also of interest and it is important to determine
the effective energy of the gamma radiation of the residual and
scattered radiation as there is some evidence that this may be well
below 200 Keve Thirdly, participating in Greenhouse would provide
valuable information on the serviceability and maintenance experience

of health physics monitoring instruments.

The information obtained

would be used to direct the future imrovement and development of
instruments for use within the AEC installationse

'

The need for these tests was discussed with John Derry and upon his

recommendation, I visited Lt. Commander Victor Delano at Los Alamos

who is the Program Director in charge of the field evaluation of
radiation detection instrumentse As a result of this visit, a proposal was submitted to Delano which recommended the extension of
Project 5el1 to include the Radiation Instruments Branch of the AEC
as one of the collaborating agencies in that projecte This proposal
was approved.
As you may know, Project 51 was originally established for the
purpose of testing Army and Navy field radiological monitoring equipmentse The Signal Corps! Engineering Laboratories and the Army
Chemical Center will have the responsibilities within the Army and
SLASSIFICATION + cANCELLED

SAT ORGY OF BGEI

*5650, 2 ai1/2.

ToseDiaz.talc3)
Wildur A. sTRRUSER 4-21-71

By:Dik KooGLe b-8-¥9

agetingare my /
hy ON

——

oe

TO ARCHTVsu

Select target paragraph3