Prior to turning over mintenanse and mpeir responsibilities for buildings end facilities to the asc as agreed (6), preventive maintenance measures were tmken with respect to buildings and tent frames, Bulléings that were not to remain in use wre closed ant se- eured, Under this program, the ‘wo tent areas were completely evacuated as soon after the departure os the bulk of the GRERUDIGE troops os possitle, Flectrical outlets mere secured, tant freues painted, latrines closed md secured, and the areas policed, Personnel of the Garrison Force were housed in aluminua barracie; tentage was shipped to USAEPAC for rehabilitation, ‘ St approximately the sam tims, Orinance and Transportation personnel of the motor pool commenced overhauling eight Badger dise tillation units installed tn the Hata Power Plant, This wrk was | Completed in the latter prt of July and the equisment was then 7 over to AEC personnel for interme, © °° o Behadilitatiog of “the mOLé POL Ayea” was commenced“28 Tune aad . ” eompleted in ebout ten days. ‘ Inspection of ‘the eight tanks sori 5 : the installation reveled that aix of thenwre)unifor’sivthar‘as 4 Le It mas believed thet the maining tanksmightconceivably be‘anima: and restored to service at a later date if requirenents ‘were pressing, - These were turned over te ABO, Valves, pipelines, fittings and other salvageable mteriils were recovered before the tankage was renoved to the reef, The entire area was levelled by bulldozer and hand - (6) ‘Memorentua of Agreement for Maintenance, Eniwetok Taland, (Annex ¢ "BY to Admin Order 5, 177-3, ¢4 16 lay 52) 16 an om: ne. -—— . woe . on -_— BEST AVAILABLE COPY REGRADED UNCLASSIFIED ORDER SEO ADSBY DAMPER &BS&O14 ——