C, DSCONTAMINATION
Responsibilities of Task Group 152,28 are limited largely to the

falend of Iniwetok,

Operations on all other inlands remain under the

Airect control ef the Atomie Inergy Comission except for certain

functions assigned to the Atoll Comanter, such as port operations,
security, and air transportation,
Deecntamination of the atoll was initiated by Task Group 5.1 of

JTH-S as an integral portion of its operation plan for GREZNOUSE,.
Badlological surveillance md activities in connection therewith

reverted to the AEC with the departure of this unit from the forvard

area.
Before the end of the reporting period, the amount of radiation

encountered on all but four islands of the atoll had diminished * a

degree which no longer constituted a danger factor, Observations i
made in areas established on Eniwetok during Operation GREXEEOUSE for
decontamination purposes were negligible,

muy oa Ban ty Yoeriru,
r

:

2,

ee

Ingebl and Hsin wes moaitcred and controlled by theAf through S|
Ma :

eae .

October 1951 (8), Ground security checks were mis regularly in thee4: :

crvas by avourityperscanal oftheGerrizcaPanwesg(FE
r
NE
- oe 44
a
tO
wes SE
ae,
Clean-up of Ealwetok Ielaad was @ contfmatag ’process dependent ee

in large measure on availability of personnel, —

(5) Ltr, T 5.2, file 202 571.2, 44 8 Jun

cedures Eniwetek Atol)

&

Ma

Gy aubjt Seourtty. Pro

-

OPY
BEST AVAILABLE C
.

on“

9

—

wom

e

REGRADED UNCL Ass,FI
ED
SEC ARMYBY DAME PE
R
Oo Yn

ADE

So2o1

Select target paragraph3