cealien wraasK
TO:
Jo.
J, S. Coe
FRoM:___Je Bo Babcock
RE:
Page 2 cont'd:
ECRecSiP TED OR DOR
CER OWVTRr 2ULY
Fa athe,
Puy oeNts
tiee
Utirik Weather Station
_
‘pave18Osteber1957—_—_——___
At 1030 heurs, formwerk was cempleted on the power house, alse grade work en
sub base elevation.
Started te place re-barse -
Plumbers started digging their trenches fer their reugh work in the day TOM,
Cast iren pipe net yet on the beach but en T boat at the beach.
.
Fly spray not tee effective on the beach in working area but ekayon the house
beate
At 1110 heurs started grading fer Barracks No. 1 form work started at 1135 hourso
Re-bar work en day reom started at 1145 hours.
The last lead of material from the LSD beached at 1215 after leaving the LSD at _
1120 heurs. One generater was damaged on the contrel panel end but is still
usable as far as we car tell at this time. Reugh handling on the LSDwas the
cause of the damages
A lecatien fer the pier was found 3/4 ef a mile to the left of our site Nand E,
It is believed that 150° er a little less will de.
more than 150'.
The mooring buey is okay.
is
ash
THO wratce
94,2
.
15, fF
OPNTEGRLLI Tg -
All other spets would require
One cecenut tree needs te be removed to make way for the mess hall, Magistrate
gave appreval and alse asked remeval of a seedling 20" high growing just in front
ef the old mess hall, The cecenut tree to be remeved is a non-bearing tree and it
is new just about parallel with the greund. Believe it was one knocked over te
make room for the mess hall tent last operatien, Gero says they have all ready
put 4 claim in fer this tree,
Barracks Ne. 1 is ready for concrete,
Page 2 of 2