mos BE: wae nuclear test suspension and néeds for testing and there was major discussion a number of times, All of this I am trying to have extracted in its entirety and , since it is classified, will be obtained for our classified files. Note that Alvin R, Luedecke assumed his dutiés as AEC General Manager on 1 December 58 and Paul F. Foster who had been acting as General Manager became Deputy General Manager on that date. Meeting #1436, 4 December 58: Commissioner Floberg showed a graph of the seismic signal of the Rainer test shot and stated that the amplitude had been over-reted and was than originally believed different The net effect of this data is to show how extremely difficult it is to detect underground test shots and a reappraisal of the GORE proposal (in the classified notes) should be considered. Foster added that this indicated the "threshold" limit for the detection of nuclear tests would have to be increased from 5 to 20 kilotons. Increasing discussion was given about this time to budget problems both within the AEC and within the US Government as a whole. Mention has been made of the Presidents concern with the gold outflow and mention is made at meeting #1437 as to the stability of the dollar in world markets due to‘the alarming increase in the gold outflow. McCone stressed these points, observing that the situation imposed a responsibility on the Commission and Staff to make every effort to achieve major AEC budget reductions for FY60. McCones' objective was to reach agreement ona greatly reduced budget in accwrdance with the Presidents criteria. The budget discussions which 32

Select target paragraph3