30 August 1978

RPC
MEMORANDUM FOR THE RECORD:

Trip Report to Enewetak,

M.1. with Department of Energy Advisory Group
1. The period for this trip report covers 22-25 August 1978 and
the activities that occurred at Enewet& Atoll, M.I. with the Department of Enmy
Mvisory Group. The IXIEAdvisory Group is chaired by Dr. !lill~am3air & 3attelle Northwest Laboratory. Other
members making the trip w-e:
Dr. !4.Templeton, Dr. R. Thompson
and Dr. 3. Gilbert of 3attelle, !lr.C. Richmond of Oak Ridge National
Laborat~~y, Dr. 2. h!cClellanof Lovelace Biomedical and Environ.4~so
mental ?ssen-ch Znstittite,Inc., and Dr. ~. Machholz of ~EQ
accompanying t~~ ;r~ug !,qere
Tommy
Nr. Roger Ray of KlE-NVOO, M.
“ ,,q>
u.. r~~, Co] Smchez of FC-DNA and myself. The following
Nccr.?wCT
summarizes
m:yobservations and views obtained thru participation
-.
and
by
individual conversations with
!n th~ :r~u~,!~
.- djs:ussi3ns
~;q~~~~b~r~.
9
after arrival> +he
commander of JTG
1973: ~’~f~r~?:y
.:
. 2? ~.!!~ust
~n which
the operation to date was reviewed.
presented a bri27ina
This consiszsd of a-brief overview of the mobilization phase with
the majar =~qhasis on current status of soil and debris removal,
the bulk haui toleration,the Runit operation, and a brief overview
of the c%obilization timing. Col. Bauchspies indicated a desire
to benefit from the groups advice and opinions on several issues
previously identified and these were individually covered by Col.
Sanchez. Tjles~issues were:

&
b.
c.
d.

Contaminated Bunker Guidance
Aomon Crypt Guidance
Soil clean-up-Criteria
Preciseness of 40-80-160 pci/gm criteria
Lujor Cover
;: Fourth Criterion Category if 160 pci can’t be met
!l” Surface hot spots-minimum areas, levels.
h. Subsurface contamination of 160 pci or greater and the l/16th
hectare area
i. Soil profiling-15 cm vs 20 cm?
j. Plowing advisability
k. Island average vs. maximum value
1. Clarification of 40-80-160 pci/gm guidelines.