wb mowands
~
o
Poy
Dew
one
ao preliminesy end
Pepeeneesy subi
“
oe
|
a
Pep
ae
acias
fan wT
i
nostles
Lov
Na,
42?7 owmotgns
mocozs,.
ao sage
.
5
“es
qewa be Ehinved,
bintenym.
These
Ltens
will
rt.
anes ekieast
cosplotin:
o RlLectrovi.cs
Delivery of electronic essemblies was completed Guring April.
Aevonartical Laboratory on 3 April,
Examination of
the data shoved thet
the test results weve very Similar to the results of the test conducte
in Janvary.
Reductior and analysis of the data has been delayed due to
the urgency of preparations for field operations,
However, a report will
be sent to UCR ss ceon ss analysis is completed.
iV. Field Tests
_
Tuo two-stage vehicior Jere test fired at WSPG on 15 and 16 April 1954.
Beth vehicles vere
heeds wero modified to accommodate DPH-41 radar beacons.
Fhis modifica~