(c)

The ground-water potentialities of Eneu and Bikini would be

defined much more precisely to facilitate resettlement planning.

(d)

The possibility of making land available for agriculture on

contaminated islands that are physically unsuitable for habitation would be
explored.

The ability of high-potassium fertilizer to block the uptake of

On

observed.

ground

water

would

be

In

the

case

of

The effects

Nam

(high

contamination), the island's tolerance for the removal of 15-20 cm of soil
would be considered.
The Committee
of these

studies

will

that within two years of initiation, the
provide

an

adequate

basis

for the

States and the Bikinians to decide on a final course of action.
preliminary

engineering

studies

should

also help to define the costs more precisely.
costs for Bikini Island

be

initiated,

Meanwhile,
which

will

As matters stand now, the

:

may be tabulated for comparison as follows:

A)

Delay resettlement for 80 years:

$25 million,

{

B)

Soil removal, lagoon dumping:

$36 million,

;

C)

Soil removal, land extension:

$42 million,

5

D)

Item C plus backfilling with

lagoon sediment:
E)

$67 million,

Soil removal plus causeway:

To the engineering costs of plans

~

B-E would

RAPE athe

various

United

$80 million.
be added

$6-8 million

for

2 te

revegetating the denuded island and providing for agricultural development.

2 teat arhale Teepe 2B

results

believes

eeeas WES RS

(where contamination is high).

Bed tplekacts cite glioma aies

compared to results on Bikini

ee

cesium-137 would be tested on Enedrik (where contamination is marginal) and

7

5000038

.

Select target paragraph3