ce. LSD Operations,
6
e asked if it were feasible to
place a helicopter landing platform on the LSD, It was pointed out that
LSD's normally have a sectional platform for helicopter landing,

Prior

to REDWING, this platform was removed from the LSD 17 go that it could

accomodate the shot barges.

Colonel Lucke was of the opinion that the

barges could be modified to rass under the platform, It was also suggested
that perhaps two LSD's would be required for HARDTACK, and that if this
developed one could be with and the other without its helicopter platform.
d. Raydist. Captain Utter asked if it was planned to utilize
Raydist during the operation. He was informed that a Cubic Corporation
device would be used in lieu of Raydist. This information was later
found to be in error, however. The Cubic system will not be used and
Raydist will be «sed as a last resort, MSQ positioning with manned
stations at Bikini and Fniwetok is preferred,

The meeting adjourned at

1600 hours and the TG 7.1 and JTF-7 representatives returned to this

headquarters,

4,

At 1300 on 9 January, Colonel Massey, Colonel Gattis, CDR Ellison

and LCDR Johnson visited AFSWP headquarters. The following points were
discussed with Lt Col Eddy, Lt Col Henry and Lt Col Wilcox of the Weapons
Test Division,
“e
a.

Support Requirements for Operation HARDTACK,

Colonel Massey

stated that 7.1 desired clarification as to which command would submit
the listing of items and units necessary to support the DOD phases of
Operation HARDTACK, Lt Col Wilcox stated he was preparing a letter to

AFSWP Field Command, information to other agencies, stating that the AFSWP

headquarters staff would be responsible for determining the items of

military support required for the DOD effects and scientific programs

of Operation HARDTACK and would present these requirenent at the 20

Fetruary conference to be held at this headquarters, Ne emphasized that
since all project proposals of the various services had not been received
by AFSWP, this list would be preliminary only end that numerous changes
and additions would rrotably be necessary, AFSWP had originally established

1 January as a deadline for all services to submit their project proposals
to AFSWP but this deadline had to be extended to 31 January. Lt Col Wilcox
feels that an additional estension will probably be mecessary.
b.

Wearons Effects Program,

Colonel Massey stated that this

headquarters had received rumors that Air Force aircraft effects part-

icipation would probably be greater than was originally believed and
asked Colonel Eddy to give us what information ne could on the effects
procramcurrently teing planned. Colonel Eddy replied that so far as his

division ‘mows the B-52 is the only Air Force aircraft scheduled to
undergo effects tests during HARDTACK,

The Navy intends to conduct certain

effects tests with the FJ4, AAD and possitly the Seamaster,

However, it

apnears certain that the aircraft effects program will be considerably

less than that conducted during Operation REDWING,

Lt Col Eddy also felt

_ AFWL/-HQ
Line! 92. u
<