Ltr, SWS, 4950th TESTGU(N), dtd 24 Jul 57,"Comments to Final Report of the

Commander, TG 7.4, Operation REDWING"
ITEM

REFERENCE NO

COMMENTS

46.

III P VC, paras

A listing of general purpose vehicle requirements

for HARDTACK has been prepared and forwarded to JTF

SEVEN where it had received tentative approval, As
indicated by his tentative allocation of general

purpose vehicles, CJTF SEVEN is effecting maximm
utilization of commercial type vehicles,
47.

III P V D, paras

1,10 - 1.13

The preparation of the TG 7.4 Long Range Construc-

tion Program during REDWING has resulted in an excel-

lent basic document.

The permanent establishment of

this Headquarters has permitted the continued moni-

toring of this program, With the excellent cooperation of JIF SEVEN and TG 7,5, this program is progressing in a most satisfactory manner, A realistic
cut-off date of 23 June 1956 was established by CJTF
SEVEN, Any changes or additions to the existing
program are being closely monitored by this Headquarters. This Headquarters is studying the requirement for portable type buildings. Hq USAF has
advised that CAS buildings will not be avaialbe,
but that a Butler-type building, 40' x 100', can
be made available. This substitute item appears to
be satisfactory.

48.

III P V D, paras
2.5

~

2.11

We believe that the establishment of the 4950th ©

Test Group (Nuclear) as a permanent organization

with the mission of planning USAF participation
in nuclear tests will prevent the neglect of the

Construction Program which occurred previously.

The 4950th has worked closely with JTF SEVEN to
reorient the construction program from time to
time to adapt it to changing requirements and to
obtain as much of the necessary ccnstruction as

possible in the off—year periods,
49.
90.6

FII P VI, paras

See Item #6, page 2.

III P VI, paras

The Budget for TG 7.4 has been submitted and

3.3

~

3.5

approved by JTF SEVEN in June 1957,

PAUL R. WIGNALL
Colonel, USAF

AFWL/ HQ

Commander

12

Lnel Jeff
Q
on

Select target paragraph3