To be used for ¥ conduct of marine radiobiological
surveys as required by the AEC, It is anticipated
that a survey will te conducted approximately one
month after the first shot and a second such survey
approximately one month after the last shot. The
normal duration of such surveys is from 10 days to 2

weeks, and an additional 4 or 5 days in the Eniwetok
area is required for the installation of special equipment associated with the survey,.:

1

CVHA

To be used as a helicopter base,

It was pointed out

that although the helicopters normally operate from
ashore, all maintenance, scheduling, administrative

work, etc., is done on the carrier, Also the carrier
is used for the evacuation of helicopters on each shot
at Bikini and for early reentry into the lagoon, CDR
Ellison stated that a CWHA is being requested in lieu

of a CVF as it is understood that all CVE's are being

placed in moth halls,

CDR Keegan (OP-33) replied that

this would be a very difficult requirement to fulfill
and asked if a TCVU could be used, CDR Ellison replied
that it aprears such a ship would be suitable provided
all equipment necessary for helicopter operations
(casoline systems, fire fighting systems, etc.) is in

full operation.

.

He emphasized that CJTF-7 had not pro-

vided funds in our budget for the activation of such
systems, In the ensuing discussion it was emphasized
that CJTF-7 recongnizes the difficulty of providing a
helicoptr~ landing platform capable of operating 15 or

more helicopters, tut that the fulfillment of this

requirement is mandatory in order to provide an afloat
capability at Bikini.
LST

To be used in logistic transport between atolls and to
auement the emergency evacuation capability. Mr. Howell
(TG 7.5) asked if this requirement envisaged the use of

Taongi.,

Commander Ellison replied in the negative, and

stated that completely new planning factors would be

required if the use of that atoll as a test site is

anproved.
AV

To be used as TG 7,1 flagship.

It is the AEWLaD

of this headquarters that the CURTISS will soon be moth-

balled,

Therefore, JTF-7 will not insist on the assign-

ment of that particular ship. However, it was pointed
out that the TG 7.1 people are familiar with the CURTISS
and would prefer its assignment over any other AV, CDR
Keegan asked if the ship had to te an AV, to which a

negative renly was given.

It was pointed out that any

equivalent type ship which could fulfill the requirements world be satisfactory.
In this respect, Dr. Felt
stated that aprroxim-tely 150 to 200 spaces would be
required half of “hich should be cabin class accommodations, The ship sould also te suitable for installation
of a firing circuit, have adequate communication facili-

ties, and considerable office space,
CDR Gustafson
pointed out that cne advantage to assigning the CURTISS
would te that rla
already exist for the rewiring of

i.

53!

Focl $y (