SWAW

Operation HARDTACK
Warheads Division

11 Jun 57

Lt Brown/ecm/2651

1.

Inclosed for your information is the revised version of the Cperation

Ground.

It should be emphasized that this information is very preliminary and

HARDTACK schedule which is planned for the Spring of 1958 at the Pacific Proving

will undoubtadly change considerably prior to operation time.
?.

Periodic revisions will be made to this schedule and will be forwarded

accordingly,

1 Incl

(CONF)

(UNCLD),

SWC 7830,266/18
3 pes (SRD)

DORENCE C, JAMESON

Lt Colonel, USAF
Chief, Warheads Division

AFWL/ HQ

“a

Select target paragraph3