a Te. 28 k 2 logistics information was to be provided in the Logistics Plan, The Logistics Coneept described the logistics relationships of Task Group 7.4 to ite elements, particularly in matters of supply, maintenance, and transportation, The planning schedule still effective on 24 July 1957 called for the submission not later than September 1957 of requirements for preposi-= tioned supplies and equipment. The late designation of elements to con- pose Task Group 7,4, however, prevented timely submissions of the requirements, This problem was expected to exist until issue of the book message. >> Planning was underway to establish e Maintenance Control Unit for, HARDTACK, based upon the system utilized successfully during REDWING. Planning was completed by July 1957 to have Maintenance Control Unit per sonnel deploy to the proving ground in sufficient time to allow a complete operational check of the control unit prior to the beginning of the operational phase of HARDTACK, The control unit during REDWING assisted air craft maintenance organizations in performing the maintenance mission, To enable Maintenance Control to expedite maintenance, to acauire supplies rapidly, and to supervise maintenance technicians, a Maintenance Control Unit communications network was established. This network provided con munications between the various maintenance and supply offices and the offices of the Group Conmsander, the Director of Materiel, and iaintenance Control; flight line raintenance stations alsc were : a: APWie nrart of the network. AFWL/ HQ 49

Select target paragraph3