Ltr, SWS, 4950th TESTGU(N), dtd 24 Jul 57, “Comments to Final Report of the
Commander, TG 7.4, Operation REDWING" ITEM
REFERENCE NO
COMMENTS
TG 7.4 will check on survival gear and training as
3h.
soon as definite units and aircraft are assigned.
As soon as these units and aircraft are assigned,
USAF will be requested to direct aircraft accident
accountability and reporting responsibility be sinilar to that used in REDWING,
356
III P V A, paras
1.6 - 1.15
AMC has reestablished Project 28 (now designated
Project F-28) as a permanent project,
The Logistics
Liaison Section has been manned by one (1) officer
and three (3) sirmen during the interim period, and
is permanently located at SMAMA,
Requisitions for
the 4951st Suprort Squadron (formerly the 4930th
Support Group) are being processed thru the Logistics
Liaison Section of this Headquarters.
The personnel
asSigned to this Section are particularly resource-
ful and highly qualified, all having gained valuable
experience on REDWING, Personnel presently scheduled
for assignment to the Logistic Liaison Section have
been interviewed, and appear to be very well qualified for their duty assignments. For additional
information see Item #2, page 2.
36,
III P V A, paras
2.5
-
2.9
The present schedule of events calls for submission
of requirements for prepositioned supplies and
equipment not later than September 1957, Our only
problem in this area is the designation of elements
of TG 7.4 in time to meet this date. Vigorous
action is being taken to have these elements des-
ignated as socn as possible, Our Logistics Support
Concept, distributed 10 July 1957 satisfies this
recommendation,
The format for submission of proj-
ect kit requirements, now being prepared, will include these recommendations.
An assembly type AFSD
will be used by the logistic Liaison Section in
processing requirements lists for prepositioned
supplies and equipment.
37.
III P V A, paras
See Item #36 above.
Procedures have been set up to
permit maintenance of complete records on local
purchase and stock fund items, The processing of
LP requests will be closely monitored by the Logis-—
tics Liaison Section and this Secticn is set up to
closely monitor the commitment of funds by SMAMA,
9
a
T ncAF Whol HQ
~~
=
sr