The construction of tie causewiy and isvand for Station 20 on the reef between
Charlie and Baker has resulted in the formatdor, * a sand fill on the outside
bulkhead that will permit tre constructio
or: ‘ukw ramp on the lagoon side.

o,

wave action.

ee

o, se Ht WELL
"PC, EC” MANAGER

SPH :ws
ccs

Re

Ae

Boettcher

E. Jeffeoat

Neil Turner

0/S Chron
0/S Central

H/O Chron

H/O Central

on PORRIMENT «cf EREROY Des

hoe

.

AUTORED BY ehh
E REVIE
5
RE W AUTH
SINGL
oad tenaoes onan ee
a & whee
E

: REVIEWER (ADD)
po)

NAME: wa ~

NATE

WA
betpH

tnA SE

30M 4-53 O

k
e
eto
i SOLAS

SB CLAS

pe

N

Iho nee

OL

“

This dukw ramp should be 13? wide end constructen win its west edge paralle]
to and on the lagoon side >f the southeast side of the island. As a tie,
the center line of the dukw ramp showl.d interse-’ the center line of the pips
arrey at Station 2 # 70 and pear S$ 24° 41" west
The bulkhead along the
Southeast side of the island will rema. ro oir tlace ane the east edge of the
vmuce for protection from
ramp will be bulkheade? + n-cessarv bootin ors