D_ PIS 3 Days
1. -Normal recovery cperationa continue.

a repeat of D plus 2 days.

This day will essentially be

2. Preliminary technical reports will be obtained where possible ant
fcr use in appropriate advisories,
-

4
1.

Reecvery continues, essentially « repoat of D plus 3 days.

5
1.

Data recovery cperations will be assumed completed on 0 plus 4 days

insofar as they pertain to Radsafe cycling’ for the next shot. Results of
the open sea fall-out. collectors will be ewaluated for possible use on

subsequent fall-out predictions.

(NOTE:

The above description will apply on all shots with appropriate
modifications on the EYIWETOK phase and on the last shot.)