D_ PIS 3 Days
1. -Normal recovery cperationa continue.
a repeat of D plus 2 days.
This day will essentially be
2. Preliminary technical reports will be obtained where possible ant
fcr use in appropriate advisories,
-
4
1.
Reecvery continues, essentially « repoat of D plus 3 days.
5
1.
Data recovery cperations will be assumed completed on 0 plus 4 days
insofar as they pertain to Radsafe cycling’ for the next shot. Results of
the open sea fall-out. collectors will be ewaluated for possible use on
subsequent fall-out predictions.
(NOTE:
The above description will apply on all shots with appropriate
modifications on the EYIWETOK phase and on the last shot.)