2 beats anchoh x9 co oferating 1m The Lagoay and are further
posit. .w@ to check the lagoon flushing and eireulation mechaniam, Lagoon
samples will be turned over to the radio-ehemistry labdoratery of the Radeafe

CENTER fer analysis.

§. At about this time, TU 7 will publish an emergeney Radsafe Plan to
go into affect in the event of & lowecrder detonation, op the extremes condition of a detonation of the high expleaive only, Thia plan is primarily
a defense against the Alpha contamination resulting from the wide spread —
of the unfissioned material and of other Alpha emitters used in conjunction
with certain shots.

BATS
i.

Semple return plan details will be completed and personnel and

equipment checked for readiness.

records on the status of contamination

task force shipe.

@ will be complsted to maintain

(early and secondary fall-@Qit) on

The radiation reperts system fram multi-engine aircraft

will be checked for readiness and adequate information placed in the hands of
7 7.3 and TG 7.4 persomel,

DAYS (Move aboard AGC for BIXDM Shets)
1.

PEM operational personnel will be alerted to the possibility

nece

l.

.

Area GREET was that area

Arpangements will be ccupleted for the reeeipt of constant altitude

balloon fines, The balloons will de set to fly at about 45,000 feet (i.s.,

abeut, 10,000 feet below the expected tropepause hetght). Using differential
ballast/helium release to contrel pressure flight altitude, the balloons
should spell out the air particle trajectory (and the expected cloud trajectory) fer the flight altitude. ‘The balloons trangmit an HP elgnal
capable of HF/DF fixing, Fixing for 72 houre per balleon will be done by