DESCRIPTIONOF

DoS

stor

lL. - The epitical shct phase of Nadsafe cperations will begin on or

avout C-§ days,

Prior to this time

seliminary planning will have incluied

sich arrangements as those for the ;«.eipt of coded Nadsafe data on the
ectatoll and the etomic cloud, wide area iiadeafe flights and fixed station
dvia, details of the heavy nuclide sampling, and 5
tion of charts
_

~1 the Radsafe OFFICE for the display of pertinent

Information,

Orinking

water samples will have been taken from the weather islands (and at quer
ciher locations ae possible) for background count and to evaluate fall-out

ia these areas, Administrative arrangements will have beon made to record
t.13 events during the shot phase for historical purposes. Special require
mts of projects or unite will have been assembled for use in briefings
c> in providing required services. Special instructions will have been
isoued relative to alert and evacuation of ENIWETOK atoll following SIKDT

sncts. Task force rehearsals will have been ccmpleted and the varicus
functions of the office will have ecmmlsted exercising all. circuits to be
used, including the transmission and reception of drill messages,

Dut
1. Om or about D=§ days, CJT? SEVEN, upon consideration of the weather
and technical aspects will announce that the shot will be turned on. This

action is the tasie decision upon which the tizing of many task force actions,
ineluding Radsafe, depend, CINCPACELT, ¢/S, USA ani Chairman, «EC. Will be

notified that a shot is proposed in five days ant

“4st hour, These advisories (as well ae subsequent advisorise to these

eireuits to ensure delivery,

In addition to the sh:

Le advised that the ECIWETUK and EIKINE airstriss will
mately 24 hours for operational reasons. «a special pre-shct advisory will

be dispatched to EMAJALEIN as required.

2. On shots subsequent to the first, the necessity for evacuations
will ve re-examined in light of the experience gained, Also, the need for

waiver of MPS (Meximas Persiseibie Byomre) for specified personnel will be
resolved st abqus this time (D-5 daya).
.
Mwial ew

|

3. By this date, TU 7 of 16 7.1 (designated fadsafe CENTER during

critical shot times) will have published a detailed recovery plan. This

ee anticipate all poscible circumstances witch may arise
pla will,
alternate recovery operations may be put into effect as
in order that
required by the redsesfe situation.

be By this date, the lagoon water sempling plan dll be complete.

sampling ‘dll be done by 127.3 (the task group having

primary interest in the results), Sampling devices will be lowersd cn &
line from e helicopter to take samples at the eurface ani at about 96 feet

(4.0., in doth the surface and the bottom lagoon currents). The sampling
have been chosen to provide the saximm information of interest

Incl 5

Gm5

Select target paragraph3