CONGibiii IAL U.S. S. CREE (ATF-84) Lie ee % FLEET POST OFFICE SAN FRANCISCO, CALIFORNIA ATF 84,/AJP:t4p A 12 June 1958 V CONFIDENTIAL From: 411009 Ser: 143-58 > Commanding Officer, U.S.S. CREE (ATF 84) Commander, Task Group 7.3 CTU 7.3.1 Technical Coordinating Unit Subj: Final report of Operation Hardtack Refs (a) CTG 7.3 Instruction 03401.1A GQ - 4 To: Via: iStTibUL. ee Por (b) CTG 7.3 Message 1622182 of April 1958 DMA shify (c) CIG 7.3 Operation Plan No. 1-58 Encl: 1. (1) Final Radiological Safety Report In compliance with references (a) and (b) the final report of Operation Hardtack for period 15 March 1958 to 10 Jume 1958 is herewith submitted. (1) PLANNING Planning information received was adequate. With the exception of washdown system, no ship modifications were necessary. Installation of wash~ down system was slow due to late arrival of material, and thus had to be installed while enroute EPG, No other special equipment was necessary, except a radio transmitter and receiver, which were delivered to CREE upon arrival Eniwetok. This involved no installation problems. (2) TRAINING Training programs were adequate. Rad~Safe and Security training. before leaving CONUS, EPG and while enroute. upon arrival Enliwetok. Only special programs were required in 60% of crew attended Rad-Safe schools Security lectures were given prior to leaving for No outside lectures or instructions were received (3) MOVEMENT TO FORWARD AREA Problems encountered on movement to forward area were due primarily to inclement weather. Between CONUS and Hawaii, sea action on Squaw 29 caused opening of flooding ports on vent valves resulting in partial flooding. It is also believed that improper design of the bullnose contributed to the parting of bridle chain on Squaw, A delay of approximately 6 days was thus required in Pearl Harbor where redesign of the bullnose and other necessary repairs were made. No other problems were encountered while enroute. CHOP date to CTG 7.3 was 17 April 198. 7. CASICERCRITENL i CEU Ni hab | . OABR?

Select target paragraph3