ros tees ITED wen CONFIDENTAL (1) OPERATIONS fee 3 (a) Navigation No problems were encountered, available charts were adequate. ability was good in all anchorages. be out of position on all charts. Holding Aero Beacon on FRED was found to (b) Track charts None were used. (c) Surface water transportation Adequacy of inter ~ atoll surface transportation for freight and personnel was considered to be good. Boat pool personnel were found to be friendly and courteous at all times. (4) Operational area No unauthorized craft were encountered in the danger area, (e) Search and rescue No SAR missions were performed. (£) Radiological safety (Enclosure one (1) (5) LOGISTICS No problems were encountered in replenishment of provisions, stores and fuel. It was felt the problem of obtaining spare parts was kept to a minimum due te the fine cooperation of all ships present in the immediate area. SOPA administrative functions were adequate. Recreation facilities were as good as could be expected. TV was good and helped moral. The three (3) day tender availability was of great value and felt to be adequate in most cases, The time for ships’ force maintenance was very limited, although no major problems occurred, (6) ADMINISTRATION AND PERSONNEL (a) No problems occurred in Personnel stabilization. One man was lost due to emergency leave just prior to leaving CONS, A second man was lost due to necessary hospitalization while in EPG. (b) Personnel allowance was adequate. (c) No changes in discipline were noted. (d) Mail service was satisfactory, although many delays were noted due to operating schedule. Guard mail was also adequate.

Select target paragraph3