ros tees ITED
wen
CONFIDENTAL
(1) OPERATIONS
fee
3
(a) Navigation
No problems were encountered, available charts were adequate.
ability was good in all anchorages.
be out of position on all charts.
Holding
Aero Beacon on FRED was found to
(b) Track charts
None were used.
(c) Surface water transportation
Adequacy of inter ~ atoll surface transportation for freight and
personnel was considered to be good. Boat pool personnel were found
to be friendly and courteous at all times.
(4) Operational area
No unauthorized craft were encountered in the danger area,
(e) Search and rescue
No SAR missions were performed.
(£) Radiological safety
(Enclosure one (1)
(5) LOGISTICS
No problems were encountered in replenishment of provisions, stores and
fuel.
It was felt the problem of obtaining spare parts was kept to a
minimum due te the fine cooperation of all ships present in the immediate
area. SOPA administrative functions were adequate. Recreation facilities
were as
good as could be expected.
TV was good and helped moral.
The
three (3) day tender availability was of great value and felt to be adequate
in most cases, The time for ships’ force maintenance was very limited,
although no major problems occurred,
(6) ADMINISTRATION AND PERSONNEL
(a) No problems occurred in Personnel stabilization.
One man was lost
due to emergency leave just prior to leaving CONS, A second man
was lost due to necessary hospitalization while in EPG.
(b) Personnel allowance was adequate.
(c) No changes in discipline were noted.
(d) Mail service was satisfactory, although many delays were noted
due to operating schedule. Guard mail was also adequate.