C.

Draft Repore

The contractor shall submit a draft report in six (6) copies as indicated

in A above. This report should include the resulte of a1) the research end
any findinge. Subaission of this draft report should mark the completion
of the major elements of the contract, except incorporation of the Department's
comments and preparation of the final report. The DOI shall heave two (2)
weeks to respond to the draft report. If the contractor does not receive a

reply or a request for an extension of time within two (2) weeks, the

contractor way assume the content of the draft report is acceptable. The
DOI may, at its option, request a meeting with the contractor to discuss
the draft report during the two (2) week review period.
‘Delivery:
D.

Six (6)

| weeks after contract award.

Ninel Report

After receipt of the department's comment on the draft report, the contractor
shall prepare and submit the finel report to the Department in six copies

as indicated in A above.

The Department will have two (2) weeks to review

the finel. report and indicated to the contractor its acceptability or afnor

modifications required. If the contractor does not receive a reply from
the Department within two (2) weeks, the contractor aay presuse-the final
report is acceptable. After acceptance or minor modification of the final
report, the contractor shall prepsre and submit thirty (30) copies of the
final report and a reproducible copy to the COTR. One copy shall be sent
to the Branch of Contracts.

Initial Delivery:

Seven (7)

Final Delivery:

Eight (8)

Z.

, weeks after contract eward.

weeks after contract avard.

Briefings

At a time to be arranged by the COTR, but no earlier than the twenty first
week of the contract, the contractor shall] arrange to have key staff,

consultants and subcontractors in attendance st @ seeting at the Department

of the Interior, Washington, D.C., to present their specific assignments
and areas of speciality and the ansver to questions on Western coal industry
from Departoent personnel.
Article V - Period of Perforsance

The contractual period of performance shall be for
of the contract award.

two months from the date

Article VI = Government's Estinate of Workload

The Governsent estimates workload for this proposed project to be forty-eight
gan-aonths.

18