Article IV - Deliverables
A.

Letter Pregess Reserts

The contractcr shall prepare and submit two letter progress reports not to
exceed five pages in length. Each of these reports shall:
lL.
eeapletion.

Idenecify project status, including an escimation of percentage

2. Report expenditures in pertod of report and cumulatively and
explain deviacions from estimated expenditure levels; and
3. Summarize work performed: accomplishments; and problems
encountered during period of report; plans for succeeding period; and

actions requested for the Desartmene of the Inrartor.

These reports shall be submicted six (45) copies,
five to the Contracting
Officer's Technical Seprasencative (COTR) and one to the Branch of Contracts.

Belfvery:
EB.

Noe later than the

4th week and the Sth week of the contract.

Detatled Work Pian

After gathering and assizilacing relevance available information on the
subject of this work effort,

the contractor shall prepare a detailed sentence

eatline of the final report. This shall be subaicted to the Deparzcenc of
the Incerior for review and commence in six (6) copies as indicated in A
above. The COTR will reply by approving or recommending sodificacioas to

Che outline within two (2) weeks of its receipe.

If necessary the COTR ray

reques¢ « seeting with key contractor personnel during the two-week seriod
to diserss the proposed detailed outline.
Qelivery:

Three veeks after contract award.