Article IV - Deliverables A. Letter Pregess Reserts The contractcr shall prepare and submit two letter progress reports not to exceed five pages in length. Each of these reports shall: lL. eeapletion. Idenecify project status, including an escimation of percentage 2. Report expenditures in pertod of report and cumulatively and explain deviacions from estimated expenditure levels; and 3. Summarize work performed: accomplishments; and problems encountered during period of report; plans for succeeding period; and actions requested for the Desartmene of the Inrartor. These reports shall be submicted six (45) copies, five to the Contracting Officer's Technical Seprasencative (COTR) and one to the Branch of Contracts. Belfvery: EB. Noe later than the 4th week and the Sth week of the contract. Detatled Work Pian After gathering and assizilacing relevance available information on the subject of this work effort, the contractor shall prepare a detailed sentence eatline of the final report. This shall be subaicted to the Deparzcenc of the Incerior for review and commence in six (6) copies as indicated in A above. The COTR will reply by approving or recommending sodificacioas to Che outline within two (2) weeks of its receipe. If necessary the COTR ray reques¢ « seeting with key contractor personnel during the two-week seriod to diserss the proposed detailed outline. Qelivery: Three veeks after contract award. e ova