3.

thot Teongi is adéec to ERG while Bikini is completely inective as a

firins facility.

III.

Purpose of the Study
The purpese of this study le to exanine the implications of developing and

cpsrating Tsorgi end to entdmate the overeall requirements generated under each

of the above eituations.
LY.

Basic éasumptions
i.

Tix following generalized type of overseas operation is considered

satisfactory for the purpose of this study:

He. of

Shots
5

Yield

|

7S i

Manner of

_iriag

Rewarks

Berge

Agout equeliy

5
5

l FE to 5 ME
20 EY ta 2 HE

Berge
2 Berge

5

< 20 EE

§ Tower

3 Towers

3

Giviedsé wetucen LAS
and UCL. “ever”

tacludcse lor 2 lend

Burfece ghotc.

Bifeets ahote (APSHP)

it is sesumeé that shots davecr than 5 ME will not bo scheduled e%
Eniuetoh.
2,

Gh geoverament will approve the use of Taongi end will meke evaileble

the necessary suppors, including funds, equinuent, material and personnel, as
required.

3.

Av. [£t-barge chennel can be cleared through the reef end within the

isscon to pernit minimum ecnetruction ashore and placement of shot barges.
h,
:

he wind yatterrs at Tacngi will permit a fixing frequency limited

entially ty technical end operational considerations only.

Germ
We ahtd

It is further

esoumed thet local coutemination at Taongi which might result from acceptable
wind ee wiil not preclude Pissing.
Vv.

Geogwey ber

ineloscxve 4 is a chart vhich indicates the reletive positicn of the EPG

_

1?»
Ayr

Select target paragraph3