im

WG

a \s)

WaRun)
Project 9,1 ~- Technical Photography - Lt Col J. 6. sames

Three RB-S0 aircraft of Project 9.1 participated on thie event,
Carter 1 and 2 in east and south quadrants respectively attempted cle d

photography at 25,000 feet but natural clow! obscuration plus heavy icing
conditions prevented sstisfactory photographic runs.
airoreft was aborte!d at B+ 15 minutes,

Mission for both

Carte: 3 at 20,000 feet 50 nautical

miles veet from ground sero,experienced fair photographic conditions until

N47 mimutes. Mission was aborted a thet time due te unfavorable weather conditions,
Carter 1) conducted a crater survey and damage survey on D+ 1,
Photography on this mission is excellest,

S56 E&P

Select target paragraph3