im
WG
a \s)
WaRun)
Project 9,1 ~- Technical Photography - Lt Col J. 6. sames
Three RB-S0 aircraft of Project 9.1 participated on thie event,
Carter 1 and 2 in east and south quadrants respectively attempted cle d
photography at 25,000 feet but natural clow! obscuration plus heavy icing
conditions prevented sstisfactory photographic runs.
airoreft was aborte!d at B+ 15 minutes,
Mission for both
Carte: 3 at 20,000 feet 50 nautical
miles veet from ground sero,experienced fair photographic conditions until
N47 mimutes. Mission was aborted a thet time due te unfavorable weather conditions,
Carter 1) conducted a crater survey and damage survey on D+ 1,
Photography on this mission is excellest,
S56 E&P