Enyu will have a small temporary camp to support project personnel necessary at that site. The camp site facilities on Eniwetok, Parry, and the camp islands at Bikini will be severely taxed due to population congestion. Shipboard accommodations, especially aboard the CVE and AGC, will also be limited. (a) Therefore, it is mandatory that: Only those personnel necessary to accomplish the mission should be in the forward area. (b) Personnel should leave the forward area as soon as their tasks are completed. (c) Personnel should be at Bikini only as long as they are required. 10. The port of entry for aircraft and most shipping will be Eniwetok. All cargo ships will stop at Bikini to receive or discharge cargo. Task Group 7.4 will be based on Eniwetok Island. _ CTG 7.1 and major elements of Task Group 7.1 Task Units and staff sections will be located on Parry Island. L3 6 Radio links with Los Alamos and Oahu will be maintained on Eniwetok Island. The capability to complete operations aboard ship, if Bikini Atoll is contaminated, will be maintained. L5.6 Except for firing party and its attached elements no personnel will be permitted within dangerous range of an armed weapon or device.